Bayliss Boatworks construction update: Bayliss 75'

by Bayliss Boatworks 12 Jul 17:54 UTC

Bayliss 75' is continuing to take shape in our hull shop. Once the hull jig was assembled, our crews wasted no time, beginning the steady process of shaping and laminating the bow stem.

It was completed mounted seamlessly to the jig in mid-June, after which our crew installed and shaped the engine stringers and sheer.

The tunnels were fabricated and installed on the hull in late June, after which our crews were able to begin fitting the first of three layers of hull planking!

In June, the flybridge for Bayliss 75' was glassed and faired, in both the exterior and interior spaces. At the month's end, the flybridge was lifted onto the cabin where it is now being glassed into place. Soon, the flybridge and cabin will receive their first rounds of primer.

Read more about Bayliss 75' here...

Related Articles

Bayliss 75 construction update
After prepping the hull, glassing began After celebrating Bayliss 75's "whiskey plank" in July, the planking screws were removed and filled with golf tees, then cut and sanded smooth. After prepping the hull, glassing began. Posted on 7 Sep
Bayliss 72' Old Reliable construction update
The bow deck on Old Reliable really took shape over the course of the last month The bow deck on Old Reliable (Bayliss 72') really took shape over the course of the last month. Once planking was completed, the bow deck was glassed, coated in ad tech, and faired. Posted on 5 Sep
Bayliss 62' Seven construction update
On the home stretch with the Paint & Fair Crew hard at work Seven (Bayliss 62') is in the home stretch! In late August, she moved into our paint bay where she received final paint. Our Paint & Fair Crew began their work with the application of a custom-blended shade of Imron "Cool Blue" on Seven's hull. Posted on 3 Sep
Bayliss 75 construction update
The last month was an eventful one After installing three layers of bottom planking, followed by three layers of side planking, our Hull Carpentry Crew celebrated placing the final plank on the hull with our ceremonial "whiskey plank Posted on 7 Aug
Bayliss 72' Old Reliable construction update
Installation of her cabin checked off Old Reliable (Bayliss 72') had another eventful month. Once her bow deck was planked, she checked off another big benchmark in the build process- the installation of her cabin. Posted on 4 Aug
Bayliss 62' Seven construction update
Getting to that point in the build process where benchmarks seem to be flying by Seven (Bayliss 62') is getting to that point in the build process where benchmarks seem to be flying by. In early July, the half-round and toe rail were installed then coated in faux-teak paint, along with the transom. Posted on 3 Aug
Bayliss 72' Old Reliable construction update
With interior walls secured, installation of her carlings begins Old Reliable (Bayliss 72') had another eventful month. With interior walls secured in June, our crew was able to turn their attention to the installation of her carlings. Next week, bow deck planking will begin. Posted on 10 Jul
Bayliss 62' Seven construction update
The entire mezzanine now faired and ready for primer The month of June was all about fairing and priming on Seven (Bayliss 62'). Over the last month, the cockpit has continued to develop. The overhang ceiling was constructed and the grill center was built. Posted on 9 Jul
Bayliss 27' Center Consoles construction update
Commissioned by the owners of Blank Check (Bayliss 75') Commissioned by the owners of Blank Check (Bayliss 75'), we began building two 27-foot center consoles in the late summer of 2019 and this month, they are ready for delivery! Posted on 7 Jul
Salty Tiger - Bayliss 62' construction update
Set to be delivered this month While it's her custom transom artwork that has garnered the most attention, she also features a teak cockpit deck and coverboards, constructed from hand-selected teak boards. Posted on 6 Jul
Marina Exchange FOOTER 138 South - Marlin 695 Series 2 - FOOTER