Bayliss Boatworks new construction update: Blue View - Bayliss 78'

by John Bayliss 6 Nov 16:58 UTC
Blue View - Bayliss 78' © John Bayliss

With her tower and hard top installed, Blue View has been nestled in our "make-ready" bay as our crews work on finalizing her exterior paint and installing her interior cabinetry.

Blue View's cockpit bulkhead will soon receive the final coat of clear coat. With the paint crew nearly wrapped up in the cockpit, the mechanical crew will soon be able to install the ice-maker in the lower mezzanine.

The spray rails are currently being fabricated by our metal works department. Her final exterior features, the bootstripe and bottom paint, will be applied after her first sea trial in December.

Up on the flybridge, our electrical department is running the console wiring rough-ins. The tower wire pulls are nearly complete. Next up, the bridge panel will be built and installed.

On the inside of Blue View, the salon is beginning to take shape as our interior cabinetry department installs the sofa bases. The galley dinette is currently being constructed and will be installed soon. Within the lower levels, teak plank floors were installed in the heads, cabinetry installations are in progress, and pullman bunks have been fabricated and installed in the staterooms.

Read more about Blue View here

Related Articles

Bayliss 62' flybridge construction update
Crew now turning their attention to the preliminary half round layout The black mask outline was applied in late October and the crew is now turning their attention to the preliminary half round layout, which will be installed later this month. Posted on 5 Nov
Bayliss 62' construction update
Things take shape in the engine room and pump room Once she was flipped right side up in September, the interior of Bayliss 62' was glassed and things began to take shape in the engine room and pump room. Posted on 4 Nov
Bayliss 72' construction update
The "whiskey plank" is a benchmark in the build process that we always look forward to around here Traditionally and historically, once the final board is fastened to complete the hull planking process, a celebration would take place. In our hull shop, we just go back to work- but we always take a team photo, and everyone always signs the last plank. Posted on 3 Nov
New construction updates: Blue View - Bayliss 78'
Blue View's hull, cabin, and bridge paint are complete The month of August has been all about paint for Blue View (Bayliss 78'). Meticulous rounds of sanding began in mid-August. All brightwork received upwards of ten coats of clear varnish before being covered up for protection during hull paint. Posted on 5 Sep
New construction updates: Bayliss 72'
Console and benchseat build-outs already underway Every single wood clamp has been put to the test over the course of the last month as work continues on the hull of Bayliss 72'. Posted on 4 Sep
New construction updates: Bayliss 62'
Work on the flybridge has been rolling right along Work on the flybridge has been rolling right along on Bayliss 62'. Once the layout was finalized, build-out of the peninsula style console and starboard benchseat commenced. Posted on 3 Sep
Bayliss 62' construction update
A couple of major exterior transformations The flybridge was glassed and faired last month. Our crew is now developing the flybridge layout and console size which will take shape over the course of the next month. Posted on 10 Aug
Blue View - Bayliss 78' update
Moved to our "make-ready" bay in mid July With her mezzanine teak work complete, our exterior carpentry crew is now attaching and gas-shocking all mezzanine lids. The bridge console electronics arrangements are being finalized and the dash panel will be cut by our CNC department. Posted on 8 Aug
Bayliss Boatworks construction update: Bayliss 62'
Checking off a milestone in late July With the cabin and bridge assembled, glassed and faired, our paint crew applied black mask paint and moved the cabin outside where she will cure over the course of the next month. Posted on 6 Aug
Bayliss Boatworks update: Bayliss 72'
Newest project started off strong on July 4th Our newest project, Bayliss 72', started off strong on July 4th. Our hull carpentry crew made quick work of the cabin jig, mahogany carlins, core-cell, and okoume planking. Posted on 5 Aug