Construction updates: Blue View - Bayliss 78'

by Bayliss Boatworks 7 May 03:34 UTC
Blue View - Bayliss 78' © Bayliss Boatworks

We hit some serious benchmarks on Blue View's appearance in April. The most dramatic was the installation of her teak toe rail. Work continues on the mezzanine, where the exterior carpentry crew is currently installing five custom stainless steel freezer boxes.

The paint crew has already primed the mezzanine and undersides of the coverboards. Within the next month, work will begin on the teak coverboards.

On the bridge, the raised deck is now in fairing and will soon be blanketed in primer. Our crew has already begun on the layout of the teak planks for the deck.

Stepping into the interior of Blue View, things are beginning to take shape. The interior carpentry crew has developed mock-ups of the galley and dinette, and will soon begin on the tackle room. The fabrication of everything from bunks to head vanities is under way in the cabinetry shop.

Our electrical department is beginning the main wire runs for all lighting and equipment. In the engine room, our mechanical crew has completed the installation of the holding tank and chiller units, and will begin plumbing the machine tunnel bilges and sumps, as well as the water maker layout over the course of the month.

Read more at baylissboatworks.com/boats/b24

Related Articles

Blank Check (Bayliss 75') delivered
Powered with MTU 16V2000 M9L engines, each with 2,600 horsepower The 75' Blank Check was christened and delivered to her owners in early April. A product of over 68,000 man-hours and nearly 28 months of labor, she will be spending much of her time at southern latitudes. Posted on 11 May
Construction updates - Tarheel Bayliss 62'
Tarheel (Bayliss 62') is now in the home stretch. While the interior carpentry crew continues to work on lower and upper level installs, our metal works department is creating a brand new custom TV lift for the salon. Posted on 9 May
Construction updates - Gypsea Bayliss 62'
We checked off several big installations in April Once her engine room was faired and primed, our mechanical crew installed her twin V12 MAN 1550 engines, two 25kw Northern Lights generators, and a Seakeeper 9 before closing everything in with the salon deck. Posted on 5 May
Construction updates - Gypsea Bayliss 62'
The hull carpentry department has been busy with Gypsea (Bayliss 62') Following the installation of her forward fuel tank in February, our crew turned their attention to building out the machine tunnel, pump shelf, engine room, forward sole, and lazarette area. Posted on 8 Apr
Construction updates: Blue View Bayliss 78'
The Crew has begun installing custom stainless steel liners Now that Blue View's cabin and flybridge are in primer, her exterior window molding has been installed and the exterior carpentry crew is in the process of laying out the toe rail. Posted on 7 Apr
Construction updates - Tarheel Bayliss 62'
The team is racing past construction benchmarks As for the cockpit, it's progressing at a rapid pace. The teak coverboards were installed in late March and the teak cockpit deck is currently under way. The tuna door is being fitted, and the Gameboat crew is gas-shocking mezzanine lids. Posted on 6 Apr
Construction updates: Bayliss 75'
It's christening month! While the exterior appearance of this build was finalized in March with the addition of her buggy top, we are seeing changes on the interior daily. Posted on 6 Apr
Construction update: Gypsea - Bayliss 62'
Forward fuel tank installed, machine tunnel buildout and framing progressed quickly With the forward fuel tank installed, machine tunnel buildout and framing progressed quickly. Our crew is currently fabricating the windlass and bow-thruster battery box, holding tank, and water tank. Posted on 7 Mar
Construction update: Blue View - Bayliss 78'
Blue View has experienced major progress on the bridge Once the space was glassed in February, the bench seats and brow wall underwent their own rounds of fairing and primer. With the console installed, work begins on the raised teak deck- a unique feature to this build, sure to be a stunner! Posted on 6 Mar
Construction update: Tarheel - Bayliss 62'
The entire flybridge on Tarheel is now in final primer This month, her faux teak drip-molding will be sighted and installed- a defining feature of the cabin which will really bring the exterior appearance together. Posted on 5 Mar